Shop By Category
Help & Settings
- Customer Service
- Sign in / Sign up
Shop industrial gravity flow rack- standard duty- built with rivet rack at Janeice Products Co Inc for efficient, first-in/first-out picking and replenishment in warehouses, stockrooms, and light-to-medium duty distribution areas. These racks use gravity-fed lanes to bring cartons, totes, or packaged parts to the pick face as inventory is loaded from the rear, reducing travel time and keeping high-velocity SKUs accessible. From order picking and kitting to staging and buffer storage, this style is a practical fit for operations that need dependable flow without moving up to heavier, higher-capacity rack systems. Janeice Products Co Inc in Aiken, South Carolina supports buyers who want to match lane layout, roller/wheel type, and rivet-rack-based framing to their SKU mix and picking method.
Sort By
Start with the load and the unit being flowed: confirm what you’re loading (cartons, totes, trays) and the maximum loaded weight per unit, then translate that into lane load (how many units per lane) and bay load (all lanes on a section). “Standard duty” is best selected by verifying the manufacturer’s published capacities for the specific rivet-rack frame, beam levels, and flow track—capacity can be limited by the uprights, the beams, the flow track, or even the decking/support method. Also check the minimum and maximum carton/tote footprint the lane can handle; lane width and the type of guides (if used) matter as much as overall rack width.
Next, design around workflow: decide whether you need true FIFO replenishment (rear load/front pick) or you’re mainly trying to reduce pick time at the face. Specify lane count and lane length based on desired days-on-hand at the pick face and replenishment frequency; longer lanes can reduce replenishment trips but can increase carton compression and speed if not controlled. Confirm the slope required for your product and packaging—too little pitch leads to stalls; too much can cause product impact at the front. If your operation includes batch picking, pick-to-cart, or kitting, consider how many accessible pick faces you need per SKU and whether you’ll stage replenishment behind the rack or access it from an aisle.
A frequently overlooked check is “product behavior” on the lane: verify that your cartons/totes have consistent bottom surfaces and sufficient rigidity so they roll reliably on the chosen wheels/rollers. Soft corrugate, irregular seams, shrink-wrapped bundles, or lightweight empty totes may need different wheel spacing, full-width rollers, or added guidance/braking to prevent skewing, wedging, or runaway product. Also confirm clearance for load/unload and any required accessories (end stops, lane dividers, entry guides, speed controllers) against the exact lane width and upright geometry of the rivet-rack build. Always validate final layout, capacities, and safety requirements against the rack and flow-track manufacturer specifications before installation and use.
A1: “Standard duty” generally indicates a moderate capacity range intended for typical cartons/totes rather than very heavy pallets or high-impact handling. The exact duty level is model-specific, so you should verify the published per-lane, per-level, and per-section capacities for the specific rivet-rack frame and the flow track components being used. The limiting factor could be the uprights, the beams, the track, or the mounting brackets—so review the full system rating, not just one component.
A2: Start with the outer dimensions of the cartons/totes (including bulges, handles, or labels) and add clearance so units don’t rub and skew. Multiple narrow lanes increase SKU density and reduce mixing, while wider lanes can tolerate minor package variation but may allow product to drift or turn. If your package sizes vary within a SKU or you see skewing, consider adding guides/dividers rather than simply increasing lane width.
A3: It depends on bottom surface and load consistency. Skate-wheel track can roll many standard cartons efficiently, but cartons with soft bottoms, uneven seams, or small footprints may bridge between wheels and stall. Roller track provides more continuous support for some containers and can improve consistency for rigid totes or wider bases. The safest approach is to match the track type and wheel/roller spacing to your smallest footprint and least rigid packaging, using manufacturer recommendations.
A4: Required pitch varies with weight, container material, bottom friction, and lane construction. Too little slope causes stalls; too much increases speed and impact at the pick face. Use the flow-track manufacturer’s guidance for your container type and weight range, then consider speed control or braking if heavier units accelerate too quickly. Also factor in site conditions—dust, debris, and temperature can change friction and flow behavior over time.
A5: It’s possible, but it increases the risk of mis-picks and jams when package sizes differ. For mixed SKUs, use separate lanes or install dividers to maintain separation. If you must share a lane, keep packaging dimensions consistent and ensure labels remain visible at the pick face; confirm the lane width and guides can prevent smaller cartons from turning sideways.
A6: Common options include lane dividers, side guides, end stops, entry guides/funnels at the replenishment side, and speed controllers/brakes. Some setups also use front rails or pick lips to keep the lead carton positioned. Availability and compatibility depend on the exact track and frame design, so confirm mounting method, lane width fit, and any capacity impact with the manufacturer data.
A7: Site safety requirements vary by facility, jurisdiction, and rack height/loading. Many installations require floor anchoring and may benefit from aisle-end guards or uprights protection in traffic areas. If you have seismic requirements, you must select a system and installation method rated for your zone and layout. Always follow the rack manufacturer’s installation instructions and consult your facility safety/compliance team as needed.
A8: Keep lanes clean and free of debris that can increase friction or block wheels/rollers. Inspect for bent axles/rollers, loose brackets, damaged stops, and misaligned tracks—small alignment issues can cause repeated stoppages. Also monitor packaging changes; a new carton supplier or different corrugate strength can change flow performance and may require adjusting slope, adding guides, or switching track type.
A9: Yes—bring your key details (container dimensions, weights, target lane depth, number of SKUs, pick method, and available footprint). Janeice Products Co Inc can help you identify suitable configurations and ensure you’re comparing the right track, frame, and accessory options. For final selection, confirm all ratings, installation requirements, and any site-specific compliance needs against the manufacturer documentation for the exact models quoted.